koma72
Petroleum
- Oct 27, 2005
- 4
Gents,
further to my message about the PCP trial to dewater a gas well, here are some more information:
Reservoir: Gas
Perf. Depth: 1714,5-1717,5 m
Static fluid level: 200m
Expected gas production @ 1200-1400m dynamic fluid level
Gas Prod.: 700scbm/d
WaterProd expected.: 50cbm/d
Pump depth 1680m
H2S: 0
CO2 0,1%
Installed PCP: NTZ350*200*ST25
Rotor: P6
Stator(elastomer) HNBR01
The PCP was installed twice and failed after couple of days operation due to parted rotor @ 150 rpm. The elastomer was found to have excessively swollen.
Does anybody have experience with this type of gas dewatering and can help us to analyse/discus the problem?
further to my message about the PCP trial to dewater a gas well, here are some more information:
Reservoir: Gas
Perf. Depth: 1714,5-1717,5 m
Static fluid level: 200m
Expected gas production @ 1200-1400m dynamic fluid level
Gas Prod.: 700scbm/d
WaterProd expected.: 50cbm/d
Pump depth 1680m
H2S: 0
CO2 0,1%
Installed PCP: NTZ350*200*ST25
Rotor: P6
Stator(elastomer) HNBR01
The PCP was installed twice and failed after couple of days operation due to parted rotor @ 150 rpm. The elastomer was found to have excessively swollen.
Does anybody have experience with this type of gas dewatering and can help us to analyse/discus the problem?