Anne651
Structural
- Oct 25, 2007
- 24
I am a little confused about the different load combinations to check for a gerber system. Is the load combination LL+DL whole length, DL whole length +1/2LL on cantilever and DL whole length +1/2LL middle?
Why 1/2LL? Obviously LL+DL whole length would govern.
My other question is how to choose the length of the cantilevered portion?
Why 1/2LL? Obviously LL+DL whole length would govern.
My other question is how to choose the length of the cantilevered portion?