Imagine a big (O&G/power plant) facility (composed of many buildings and equipment) that has a large grounding mesh beneath it. This mesh is completely interconnected with each other.
Is it mandatory that every power cable feeding different boards/motors in this installation has a bare/isolated grounding (PE-Protective earth) wire within it? Or can I only distribute 3 phases and neutral and bond each board's ground bus to this mesh?
I am looking for standards under IEC or NEC world to justify or not this practice
Thank you in advance!
JBC
.......
"The more I read, the more I acquire, the more certain I am that I know nothing"
Imagine a big (O&G/power plant) facility (composed of many buildings and equipment) that has a large grounding mesh beneath it. This mesh is completely interconnected with each other.
Is it mandatory that every power cable feeding different boards/motors in this installation has a bare/isolated grounding (PE-Protective earth) wire within it? Or can I only distribute 3 phases and neutral and bond each board's ground bus to this mesh?
I am looking for standards under IEC or NEC world to justify or not this practice
Thank you in advance!
JBC
.......
"The more I read, the more I acquire, the more certain I am that I know nothing"