Hallo,
I need help on tendering for the design of a industrial building. I am from SA and not 100% familiar with the estimated guess method used as guide line to tender in the UK.
Will it be reasonable to estimate the professional fee at 1.5% of construction value? (Super and sub structure design)
..or will it be best just to estimate potential time spend on design and then charge a hourly rate on that?
Thanks in advance for the support.
I need help on tendering for the design of a industrial building. I am from SA and not 100% familiar with the estimated guess method used as guide line to tender in the UK.
Will it be reasonable to estimate the professional fee at 1.5% of construction value? (Super and sub structure design)
..or will it be best just to estimate potential time spend on design and then charge a hourly rate on that?
Thanks in advance for the support.