ProjectEng
Chemical
- Nov 6, 2002
- 55
Water is being pumped from a CT pump pit to 2 large condensers and then the rest of the building needs. Risers from the CW supply header come up to each condenser. The return from each condenser go into the return header back to the cooling tower.
Assume the pressure drop through one condenser is 15psi. Neglect elevation changes. What is the head requirement just for the two condensers?
Assume the pressure drop through one condenser is 15psi. Neglect elevation changes. What is the head requirement just for the two condensers?