Moamen2020, the depth is 19.68 inches, width 12 inches and thickness of slab (flange of T-beam) 4 inches. I was there in the pour, the slabs and beam were poured at same time or monolithic. If there are really separation between layers. It's great cause of worry because the beam being separated from the flange can no longer make it work as one unit, the compression zone can be said to be broken (the horizontal cracks) and this may not make compression work property (just like column with vertical cracks) although there are 2 compression bars on top with a diameter of 0.8 inch and 60000 psi. The loads and member sizes and reinforcements are fully in line with design code so no problem with it.