The contractor has hot-bent some N28 rebar that was epoxy-doweled into some new construction. N is 500+ MPa reinforcement. I know a little about the material properties of 300 MPa steels but not this.
The structure is subject to heavy fatigue loading (limiting factor) but only a low percentage of yield strength required. Is there a sensible way to determine the likely loss of strength of the epoxy? Proof loading will check ultimate but are there likely to be any fatigue issues with the bonding?