abusementpark
Structural
- Dec 23, 2007
- 1,086
How long should a concrete truck mix water that is added on site?
I know it isn't a good practice at all, but it happens. Any ideas on the minimum amount of time it should mix after the water is added before it is poured? Does ACI comment on this matter?
I know it isn't a good practice at all, but it happens. Any ideas on the minimum amount of time it should mix after the water is added before it is poured? Does ACI comment on this matter?