alexmax
Computer
- Jul 8, 2015
- 2
Hello all..
I'm doing a small project at my house with GFRC, with a mix of 1:1 cement to sand by weight, and I was wondering how can I calculate how much do I need for the mix to get the materials ready?
I calculated the volume that needs to be filled and it's about 4 cubic feet.
Thanks in advance
I'm doing a small project at my house with GFRC, with a mix of 1:1 cement to sand by weight, and I was wondering how can I calculate how much do I need for the mix to get the materials ready?
I calculated the volume that needs to be filled and it's about 4 cubic feet.
Thanks in advance