Hi friends
I am designing a mixed steel floor ( steel beams supporting prefabricated slabs). I want to apply the Sap 2000 "edge moment release" options. Does anybody have any example or clue on how to applied these moment releases in a slab in SAP 2000?. I looked in Watch and learn and google and I did not find any example.
Thanks for your help
I am designing a mixed steel floor ( steel beams supporting prefabricated slabs). I want to apply the Sap 2000 "edge moment release" options. Does anybody have any example or clue on how to applied these moment releases in a slab in SAP 2000?. I looked in Watch and learn and google and I did not find any example.