komeiljalali
Mechanical
- Jul 26, 2023
- 1
Hi Everyone, I am designing HVAC duct for a primary crusher for a gold mining company, I appreciate it if you could help me in this regard, as I don't know if the calculations I have done are solid. thanks!
MAU airflow (CFM): 10756 (winter design)
MAU heating load: 1150009 btu
the primary crusher valumm:7310 cubic meters
ACH: 2.5
winter outdoor Temp: -40 C
winter indoor Temp: 5 C
(the equipment name: baghouse, transfer conveyor, primary crusher, apron feeder, grizzly screen)
In advance thank you for your help.