As much as I dislike I-joists, I am stuck with them on this job. Looking for some feedback on this detail...
1) Does the connection between the double rafters seem reasonable? Not a lot of ply to ply load here, just a monster 28' span.
2) For the connection to the top plate, does anyone know how much uplift I can get out of the i-joist before the bottom flange fails?
3) For the perimeter band, does it seem reasonable to nail into the end of the flanges or should I use a filler block?
I have not shown the blocking between the joists over the wall.
Thanks!
1) Does the connection between the double rafters seem reasonable? Not a lot of ply to ply load here, just a monster 28' span.
2) For the connection to the top plate, does anyone know how much uplift I can get out of the i-joist before the bottom flange fails?
3) For the perimeter band, does it seem reasonable to nail into the end of the flanges or should I use a filler block?

I have not shown the blocking between the joists over the wall.
Thanks!