Dear all,
What is the difference between IFC (issued for construction) and detail design? How are these connected to FEED (front end engineering design)? Please help.
 
Replies continue below

Recommended for you

Some of these terms are used rather loosely by engineers in various disciplines and locations around the States. However, here is my shot at trying to help define these:
1) "IFC" is the fully-completed design documents set, sealed and signed, and ready to permit and build from.
2) "Detailed Design" corresponds to the 95%-completion level of document development, ready for final client review and comment.
3) "FEED" corresponds to the 35%-completion level of document development (beyond initial concept design), ready for initial client review and comment.
Dave

Thaidavid
 
Thaidavid's description seems to roughly correspond to the following for aerospace product development:
preliminary design - conceptual design solid enough to confirm that requirements are being met
critical design - detailed design that requires minor drawing completion, but is otherwise ready for procurement
technical data package - finalized design package typically delivered with the finished product.

TTFN
I can do absolutely anything. I'm an expert!
homework forum: //faq731-376 forum1529
 
I would say that detailed design takes it from FEED through IFC including the 100% submittal and possibly other submittals for permits, etc.
 
Here's is my (somewhat limited) understanding of the terms:

FEL = FEED = SD = 30% = Preliminary Design = Bridging Documents

DD = 60%

IFB = 90%

IFC = CD = 100%


Notes:
There may be multiple FEL or FEED stages.
There is often a 90% stage to check a design prior to IFC.

SD/CD/DD are typically for building type jobs and are defined by the AIA (American Institute of Architects)
30%/60%/90%/100% is typically used in heavy civil construction. Heavy civil sometimes uses SD/CD/DD.

FEL/FEED/IFB/IFC are typically used in the oil, gas, & chemicals industry as well as other heavy industries.

Terms such as TDP and critical design are primarily used in the mechanical/aerospace industries


FEL = Front End Loaded
FEED = Front End Engineering Design
SD = Schematic Design
DD = Design Development
CD = Contract Documents