bevjones2009
Chemical
- Jan 20, 2009
- 34
Hi all,
I am quite knowledgeable on inline testing with test equipment involving loads cells etc... but I am trying to rack my brains on a method I read about some years ago where the line had to have isolation valves installed and an injection point for nitrogen. The pressure would be increased and a calibrated gauge would be watched for the "Set Point" of the PSV.
I'm not interested in using this method, but it is starting to annoy me that I cannot remember the name of the method.
Can anyone help me?
Many thanks in advance.
I am quite knowledgeable on inline testing with test equipment involving loads cells etc... but I am trying to rack my brains on a method I read about some years ago where the line had to have isolation valves installed and an injection point for nitrogen. The pressure would be increased and a calibrated gauge would be watched for the "Set Point" of the PSV.
I'm not interested in using this method, but it is starting to annoy me that I cannot remember the name of the method.
Can anyone help me?
Many thanks in advance.