r0174ld99
Electrical
- Feb 4, 2009
- 4
My company using an Mitsui-ABB Steam Turbine with Meiden Brushless Alternator 27500KVA, unfortunately after more than 10 years of continues operation, this generator never been major overhauled, we only do minor overhaul every two years.
We did'nt have the complete manual book, so we are definetedly confuse about what we should do on major overhaul (Electric works for Generator).
Could anybody explain to me, what is the work item (Electrical work) for the Generator's major overhaul, what should we check or inspect, what parts should we replace,and what is the time interval for major overhaul?
We did'nt have the complete manual book, so we are definetedly confuse about what we should do on major overhaul (Electric works for Generator).
Could anybody explain to me, what is the work item (Electrical work) for the Generator's major overhaul, what should we check or inspect, what parts should we replace,and what is the time interval for major overhaul?