A facililty has several old gensets plus a couple of new ones. They run them in an 'n-1' config for load.They have had several instances where if a genset trips then the others do not easily pick up the load. The fairly long delayed automatic load shedding comes into play and they loose big sectiond of the distribution system.
I have suggested to them that maybe the old governers/AVRs have gone out of spec for response times. Can anyone the suggest any other thoughts? Also, except for off line drop/accept load tests are there any other test methods to determine response. Gensets range from 700kW to 2000kW at 11kV