Would like a down and dirty explanation or references to basic explanation of modes
of generator operation. Particularly "blackstart" of gas turbine power plant in a
municipal power setting, the operation of 3 generators 20MW+20MW+40MW.
What do I expect to happen with no existing grid to sync to?
of generator operation. Particularly "blackstart" of gas turbine power plant in a
municipal power setting, the operation of 3 generators 20MW+20MW+40MW.
What do I expect to happen with no existing grid to sync to?