PBEIT
Structural
- Sep 9, 2013
- 13
I have a 4' concrete pier that will have loads of approx. 50K vert. and 2K horizontally and is supported by a 1'-0" thick spread footing. The pier is located inside a concrete wall of equal height on a 8" strip footing. Just curious I need to isolate the footings at all or if I should plan on the contractor doing both footings in one pour and then coming back and doing the wall and column with or without an isolation joint between them.