RockChick
Geotechnical
- Jan 25, 2012
- 7
I am doing the geotech for a water/sanitation agency project involving a jack and bore of a new main sewer line under a creek. its a narrow channel but their planned bore path has only 8 feet of planned cover which will still be within the modern alluvium at the center of the channel. are there any mitigation measures to avoid caving in the narrow patch of alluvium besides increasing the depth of cover?