sv879
Mechanical
- Dec 7, 2018
- 68
Dear Experts,
The diagram below depicts the proposed single interlock pre-action (+dry pendent, as directed by project consultant) for a cold storage area.
The detection portion is handled by the VESDA system. (The pre-action system does not have a control panel)
Kindly take a look at the scheme and give me your valuable feedback and suggestions.
Thanks in advance.
The diagram below depicts the proposed single interlock pre-action (+dry pendent, as directed by project consultant) for a cold storage area.
The detection portion is handled by the VESDA system. (The pre-action system does not have a control panel)
Kindly take a look at the scheme and give me your valuable feedback and suggestions.
Thanks in advance.