Nov 20, 2024 #1 shvet Petroleum Aug 14, 2015 693 Dear forummembers Is here anybody familiar with such L-L level control scheme? Is this method workable or not? Attachments L-L.png 1.3 MB · Views: 9
Dear forummembers Is here anybody familiar with such L-L level control scheme? Is this method workable or not?
Nov 26, 2024 Thread starter #21 shvet Petroleum Aug 14, 2015 693 georgeverghese said: Could this be part of an EPC contract ? Click to expand... Not. This is a local engineering contractor, not EPC. Upvote 0 Downvote
georgeverghese said: Could this be part of an EPC contract ? Click to expand... Not. This is a local engineering contractor, not EPC.