We have a project where a backfill of 1.5 m is required. This is over a large area (12 m x 25 m), which was over-excavated previously. Pit locations and core locations have changed since project went on hold. Contractor wants to use M15 PCC (2000 psi lean concrete) to backfill.
Are there any restrictions in terms of maximum thickness of layers? I was thinking of specifying 3 layers of 500 mm thickness. What should be the time duration between placement of various layers? For example, should the second layer be placed 6 hours after the first layer has been placed or some such?
Are there any restrictions in terms of maximum thickness of layers? I was thinking of specifying 3 layers of 500 mm thickness. What should be the time duration between placement of various layers? For example, should the second layer be placed 6 hours after the first layer has been placed or some such?