Gopher13
Structural
- Jun 21, 2016
- 94
A building addition I am working on includes a new mechanical penthouse on the existing roof. Light gauge steel studs will be used for the walls. I do not have any experience in light gauge design and was given a short schedule to design the entire addition so I am thinking about delegating the design of these. I would like to use these walls as shear walls for the penthouse. My question is where should the delegated design stop? Do I design the plywood sheathing and associated fasteners and fastener spacing to complete the shear wall or would they?