theclipper
Structural
- Jan 16, 2003
- 24
I recently rejected a LW concrete submittal becuse it came in a 120 pcf, and my spec required 115 pcf max. The contractor just called me to say that the supplier assures me that if they mix it at 120 at the plant - by the time it gets/delivered/placed it loses about 6 pcf. Anybody ever hear of that one?