DJYork
Structural
- Sep 22, 2004
- 57
I have a school with a fine arts building. It has an opening for the stage of 45’, and I need to design the lintel. The CMU above is a 44ft and I feel I can not do triangle loading due to the need of control joints. Also, it is supporting a fly-loft and roof, because I can not do the triangle loading (DL = 4000plf, LL = 1200plf).
I have tried fixing column to help with deflection, but for a lintel of this length I am having very heavy members.
Is there any suggestions on a better approach for this long of a span?
I have tried fixing column to help with deflection, but for a lintel of this length I am having very heavy members.
Is there any suggestions on a better approach for this long of a span?