I have to check a concrete framed building and slab for the case of a heavy crane that will support it temporarily as a steel superstructure is erected. What load factors would be appropriate for use with ACI?
1.4 DL + 1.4 Crane Weight?
1.2 DL + 1.6 Crane Weight?
1.2 DL + 1.2 Crane Weight?
The last one makes sense to me since crane weight is a well determined dead load and 1.4 would be conservative for such a short term loading(about a week at the same location). The ASCE publication on construction loads is not specific on load combinations. Is it?
thanks in advance
ijr
I have to check a concrete framed building and slab for the case of a heavy crane that will support it temporarily as a steel superstructure is erected. What load factors would be appropriate for use with ACI?
1.4 DL + 1.4 Crane Weight?
1.2 DL + 1.6 Crane Weight?
1.2 DL + 1.2 Crane Weight?
The last one makes sense to me since crane weight is a well determined dead load and 1.4 would be conservative for such a short term loading(about a week at the same location). The ASCE publication on construction loads is not specific on load combinations. Is it?
thanks in advance
ijr