If a load limit was set to 500kg per square metre on a concrete slab floor of a high rise building on the 11th floor.
A 6 metre beam was fixed to the ceiling concrete slab at 500mm intervals.
A trolley beam was loaded to 1 tonne and the load traversed across the beam.
Is the load to the slab divided into 6 or by two.
Is the slab load limit exceeded by the weight of the beam.
If the fixings from the beam to the slab ceiling were moved to 2 metres the beam properties would increase and the weight increased constraining the dimensions and load allowable on the slab.
If there were persons and equipment on the 12th floor directly above the beam and load would this also increase the load on the slab in that square metre.
A 6 metre beam was fixed to the ceiling concrete slab at 500mm intervals.
A trolley beam was loaded to 1 tonne and the load traversed across the beam.
Is the load to the slab divided into 6 or by two.
Is the slab load limit exceeded by the weight of the beam.
If the fixings from the beam to the slab ceiling were moved to 2 metres the beam properties would increase and the weight increased constraining the dimensions and load allowable on the slab.
If there were persons and equipment on the 12th floor directly above the beam and load would this also increase the load on the slab in that square metre.