lgc35
Mechanical
- Jul 28, 2013
- 1
Hi. I'm trying to figure out if I can effectively use Project for scheduled maintenance planning of a bunch of assets we have for a pile drilling company (trying to avoid expensive specialised packages).
Basically, I want to be able to schedule maintenance tasks based on both the hours on the machine and date. i.e. assign the machines to projects and have Projects tell me/estimate what date I will need to say change the hydraulic oil (which needs to be done every 400hours for example)
I'm not sure if Project can do this/is ideal to do this, as I haven't found anything through searching. I'm hoping someone can at least point me in the right direction in terms of whether it can/can't be done. Otherwise I'm in for a big Excel mission.
Any help would be appreciated!
Basically, I want to be able to schedule maintenance tasks based on both the hours on the machine and date. i.e. assign the machines to projects and have Projects tell me/estimate what date I will need to say change the hydraulic oil (which needs to be done every 400hours for example)
I'm not sure if Project can do this/is ideal to do this, as I haven't found anything through searching. I'm hoping someone can at least point me in the right direction in terms of whether it can/can't be done. Otherwise I'm in for a big Excel mission.
Any help would be appreciated!