I have couple of questions regarding a 34.5kV substation yard of an industrial facility, it contains a 34.5 kV outdoor switchgear and a 34.5kV outdoor oil type transformer.
The substation is on the load side of the utility meter, so technically it is in the jurisdiction of NEC. Can we still use the clearances mentioned in section 11 of NESC for doing the physical design of this substation? Also can we use NESC section 11 for fence-grounding, or should the fence-grounding be done as per NEC 250.194. Thanks
The substation is on the load side of the utility meter, so technically it is in the jurisdiction of NEC. Can we still use the clearances mentioned in section 11 of NESC for doing the physical design of this substation? Also can we use NESC section 11 for fence-grounding, or should the fence-grounding be done as per NEC 250.194. Thanks