Seppe
Structural
- Mar 8, 2016
- 53
Continue...
Previous thread (Part 06)
[link ]
[/url]
Previous thread (Part 06)
[link ]
[/url]
Follow along with the video below to see how to install our site as a web app on your home screen.
Note: This feature may not be available in some browsers.
bones206 said:So the logic I am inferring from this sequence is that the collapse in the garage documented by the tik tok video could not have PRECEEDED the collapse of the surface parking area near the lobby, or they certainly would have noticed it before getting on the elevator.
mechinnc said:So where does the few minutes between patio collapse and building collapse fit in with what this crew saw? Presumably the garage collapse as seen in the tic tok vid had not happened yet while they were in the garage.
Washington Post said:The first thing she noticed was the knocking.
Then came a crash so loud, Sara Nir wondered whether a wall had come down somewhere in Champlain Towers South. And the second crash minutes after, in the lobby, where she witnessed the collapse of the car park.
Startled and up later than usual after an event, she put down her phone at 1:14 a.m. and made the short walk to the security guard in the lobby. The guard mentioned hearing the strange noises, too, but was unsure what to make of them.
Nir was still standing at the desk when a metallic boom reverberated across the building’s 12 floors.
Through the lobby’s wall of windows, Nir saw cars jutting out of the ground, some standing nearly upright, and the pool deck caved in. An earthquake, she thought, dashing back toward Unit 111, toward her kids.
I did not mean that I thought that they should excavate below the slab, I just thought it looked like they were doing that. Later in the day it looks as if they have sawn a hole in the slab and drained out a lot of the water.CE3527 (Civil/Environmental)16 Jul 21 19:44 said:I'm still thinking no on the slab on grade removal,
Paul Austin said:Don't forget poor Cassondra Stratton statement about the pool collapsing and the building shaking. She was at the unit 410
CE3527 said:but there isn't any evidence the alarm ever sounded in the building
Unit 1008 and 211. 1008 had roughly 1.75" additional tile, where 211 had close to 3", as it was above the lower rail of the balcony rail, which was installed with a 2" spacing.MaudSTL said:Here's some new info, so far as I can tell.
In reviewing some stories in Engineering News-Record, I found two pieces of information that may not have been previously discussed.
Jose Santini, a businessperson with a company that sells hurricane shutters, commented on an ENR article entitled, "Engineers Try to Fathom Factors Leading to Deadly Champlain Towers Collapse." In his comments, Mr. Santini states that at least two of the apartments in the part of the building that collapsed had 3" topping and tile added to about 2500 sf apiece. He did not name the two unit numbers, but did say he has photos available, and expressed his concern that this may have helped create an overload situation in a building with known subsidence. If anyone is a subscriber to ENR, you may wish to invite Mr. Santini to join this discussion and upload his photos.
Along with the roofer working on anchors and more, T-Mobile's contractor was also up on the roof doing antenna upgrade work on a permit issued 4/30/21. The upgrade work is not further described.
Spartan5 said:In her first interview, she makes no mention of a noise like a wall collapse; describing the sounds as “construction knocks” or “renovation noises.”
Demented said:Unit 1008 and 211. 1008 had roughly 1.75" additional tile, where 211 had close to 3", as it was above the lower rail of the balcony rail, which was installed with a 2" spacing.
With that amount, yes. The only two, no. Source is 2018 MC assessment as well as personal knowledge of the balcony railing job that was to be completed with the renovations. Field dimensions were to be verified after balcony work began because there was some inconsistencies in the as builts vs the drawn, and decisions needed to be made over filling existing core holes and using base plates with 1/4" x 2-3/4" 308L stainless tapcons (because rusting stainless on the beach is better somehow) or using existing core holes. Over the years there has been at least 100 unpermitted renovations to the balcony surfaces. Home Depot sells all the stuff you need.MaudSTL said:Thanks! Are these the only two units with that amount of topping? Is the source the 2018 MC assessment?
CE3527 said:… but there isn't any evidence the alarm ever sounded in the building. If it had, 6 minutes pre-collapse would have been plenty of time to wake people up and get them out.