Looking for advice on moisture conditioning nylon from anyone who has experience with the process in industrial setting for production parts (this is not for testing). I am looking not for why, but more how. To offer some rough numbers:
144/parts/day
smaller fuel tanks - 27"x26"x7" & 24"x19"x12"
Would like parts to reach equib. in 24 hrs (wishful)
I am looking for possible methods. Also what not to do, and is the 24 hr period feasible.
Thank You,
Alex
144/parts/day
smaller fuel tanks - 27"x26"x7" & 24"x19"x12"
Would like parts to reach equib. in 24 hrs (wishful)
I am looking for possible methods. Also what not to do, and is the 24 hr period feasible.
Thank You,
Alex