z8e
Civil/Environmental
- Jan 28, 2005
- 15
Hello,
I don't know if this is an appropriate question, but I'll take the chance. . .I'm working on a residential 110-lot subdivision that will require a lift station and about 1,000 feet of force main dumping into a gravity sewer system. I need help with the design. That could be anything from some hand-holding to a turn-key design. I'm not looking for pro bono work, I would expect to pay.
Thanks.
I don't know if this is an appropriate question, but I'll take the chance. . .I'm working on a residential 110-lot subdivision that will require a lift station and about 1,000 feet of force main dumping into a gravity sewer system. I need help with the design. That could be anything from some hand-holding to a turn-key design. I'm not looking for pro bono work, I would expect to pay.
Thanks.