bulkman
Materials
- Oct 15, 2002
- 2
I have a 22 by 24 ft garage that has a ridge beam with a slight sag at the splice. The ridge beam is a 2x10 and consist of 1 16ft and 1 8ft The problem is I have a sag of 3/4 to 1 inch at the joint. The rafters and collar ties are in place but the sheathing has yet to be installed. My question is: If I jack up the splice the necessary amount to make the ridge beam straight and apply the sheathing will the ridge beam stay at the corrected straight position once the sheathing is installed and the jack is removed?
Thanks for any help.
Geno
Thanks for any help.
Geno