AJ92
Mechanical
- Aug 24, 2017
- 1
I am relatively new to fire sprinkler design and using Hydrcad(about 1 month into a new job) and I was wondering at what point do BTS lines stop following the piping and you can specify a new BTS. I have my top of steel references for the entire structure but am having a hard time getting the elevation to lie where i would like it to for the piping ( usually when I specify BTS a few times and rise up into 3D it says that it is over defined and already specified elevation from another point for certain pipes and discards the BTS tag.) I guess my question is how can I follow the system to know what is being elevated by which lines). This is proving detrimental when moving from one room to another with vaulted ceilings and changing elevation. I appreciate the help in advance.