mpstrack1
Mechanical
- Sep 22, 2015
- 4
I have an assembly with all components fully constrained. These components have electrical routing ports. When I create splines with circular stock assigned to them I get conflicts between the automatically assigned routing constraints and the component constraints.
Has anyone else had constraint conflicts using electrical routing?
Could it be because I'm assigning terminals by locating them at points that are part of an array?
Has anyone else had constraint conflicts using electrical routing?
Could it be because I'm assigning terminals by locating them at points that are part of an array?