ASTM C-42 5.2 Core Drilling—A core specimen shall be drilled perpendicular to the surface and not near formed joints or obvious edges of a unit of deposit.
Suppose you have a 36"x36" column poured from the foundation to the bottom of the first level. Is it acceptable to takes cores from the top of column vertically?