EngDM
Structural
- Aug 10, 2021
- 599
Hey all,
What are my options if I determine that an existing baseplate / anchor bolt configuration is inadequate for the new lateral loads due to a new crane? Is the typical solution to weld on a plate extension with new bolts such that shear is satisfied and increase the pilaster width and dowel this new concrete to the existing concrete, perhaps providing a concrete bonding agent between the two pours?
When you have two concrete pours, is my understanding correct that the breakout cones still stop at the interface of the two pours?
What are my options if I determine that an existing baseplate / anchor bolt configuration is inadequate for the new lateral loads due to a new crane? Is the typical solution to weld on a plate extension with new bolts such that shear is satisfied and increase the pilaster width and dowel this new concrete to the existing concrete, perhaps providing a concrete bonding agent between the two pours?
When you have two concrete pours, is my understanding correct that the breakout cones still stop at the interface of the two pours?