WARose
Structural
- Mar 17, 2011
- 5,594
I’ve been forced into a situation where I’m probably going to have to use some Ordinary/intermediate moment frames in a seismic situation. As far as I can tell, the strong column-weak beam requirement doesn’t kick in until you get to a “special” moment frame for ACI. Is that how everyone else reads it? I wanted to be sure of it because I have the reverse. (I.e. weak column-strong beam.) I have rarely used ACI for this purpose over the years. Thanks.