kts14
Mechanical
- Jan 29, 2014
- 22
Hi,
I'm using NX8.5.
I had a cylindrical part with 3 steps and each step will have different parts assembled.
Now, in the drafing sheet, I wanted to show a table with first column as "Steps" and second Column as "Part Number" and third column as "Qty".
For this purpose I use "Part List" because I wanted to show some part attributes also apart from the above three columns and everything is perfect accept the first Column.Though the PC.No i.,e "Steps" is in the same required order 1,2, and 3 but they are not matching with 3D model order.
Adding a callout attribute for each part is an option but the part is not going to get assembled in the same step everytime.It varies depending on the design requirement and I dont want to assign a component attribute fro each component in every assembly file every time.
So, what I do is, I'll ballon the items first and I wanted to link this ballon value to the first column of my part List. which is exactly the reverse process of what we do- first part list and then auto balloon.
Is it possible?
I'm using NX8.5.
I had a cylindrical part with 3 steps and each step will have different parts assembled.
Now, in the drafing sheet, I wanted to show a table with first column as "Steps" and second Column as "Part Number" and third column as "Qty".
For this purpose I use "Part List" because I wanted to show some part attributes also apart from the above three columns and everything is perfect accept the first Column.Though the PC.No i.,e "Steps" is in the same required order 1,2, and 3 but they are not matching with 3D model order.
Adding a callout attribute for each part is an option but the part is not going to get assembled in the same step everytime.It varies depending on the design requirement and I dont want to assign a component attribute fro each component in every assembly file every time.
So, what I do is, I'll ballon the items first and I wanted to link this ballon value to the first column of my part List. which is exactly the reverse process of what we do- first part list and then auto balloon.
Is it possible?