TransHead
Industrial
- Jan 4, 2013
- 2
I was talking with a colleague today and we were discussing a topic that made me think. So when you stamp a drawing, you are validating that the design represented on/in the drawing meets all engineering (structural) standards. The question that came about from the conversation is whether the PE stamp covers just the "first article" built from that stamped drawing or for every duplicate made from that stamped drawing (understanding that all quantities of duplicates are made to the specification of the stamped drawing)?
So basically, does a PE stamp certify a drawing for one time usage or does it certify the drawing period and any subsequent reproductions from a PE stamped document also stand to be considered certified?
So basically, does a PE stamp certify a drawing for one time usage or does it certify the drawing period and any subsequent reproductions from a PE stamped document also stand to be considered certified?