zeeshanahmed
Civil/Environmental
- Dec 16, 2007
- 23
two towers of 10 stories are 30ft apart, and there is a need of pedestrian bridge on every story level between the two towers. Building is in Zone-III. The principle design engineer thinks that it cannot be bridged with a steel structure pedestrian bridge as the buildings are expected to sway upto 4 inches with different mode shapes, Also the second mode shape when both buildings sway towards each other the bridge will come apart.
My question is that is he right ? and is there anyway that we can fit in a steel girder bridge between two towers or not ? how will the joints be detailed to cater building's movement in different mode shapes. ?