- May 16, 2001
- 578
I've got a one story commercial structure (metal deck, bar joists, steel girders), and the roof is essentially perforated with sky lights all over the place. How many penetrations (maybe as a percent of the overall roof area?) are allowed before you have to reevaluate the diaphragm strength? Or can you make the frame around the openings rigid enough to transfer the diaphragm forces?