phuduhudu
Structural
- Apr 19, 2001
- 261
I have a load factor question. I am doing pile design and geotech have given me an allowable pile service load based on an FOS of 3. However, they say this can be reduced to 2.5 for the transient portion of the load e.g. wind and earthquake. For wind there is no problem but ASCE also allows overturning moments for soil structure interface loads to be reduced by 0.75. Does that mean I can effectively reduce my earthquake loads by 0.75*2.5/3 = 0.6225? Or am I combining 2 factors doing the same thing?