Hello
I have a raft supported on piles. The cur off level of the piles was based on a thicker raft. However the raft got reduced.
To make it short the embedment length of 50xbar pile diamter is not ensured. So the contractor is willing to break the top of rhe pile and splice the old reinf'f with new one.
My question is : lets say i need 1.5m embedment depth, 1m is available. Should the contractor break 50cm or he should break 1.5 meter to ensure the full embedment ?
Thank u
I have a raft supported on piles. The cur off level of the piles was based on a thicker raft. However the raft got reduced.
To make it short the embedment length of 50xbar pile diamter is not ensured. So the contractor is willing to break the top of rhe pile and splice the old reinf'f with new one.
My question is : lets say i need 1.5m embedment depth, 1m is available. Should the contractor break 50cm or he should break 1.5 meter to ensure the full embedment ?