steve111
Structural
- Apr 3, 2001
- 53
We have a 50,000 sq.ft. warehouse that needs a new floor slab. The existing facility was destroyed by fire and the slab on grade is in poor condition. The contractor would like to place a 3" slab/topping over the existing slab. Looking for suggestions wrt. mix design, curing, jointing, srfc. prep., etc. Thanks.