Hi Guys,
I am working on a project which has a 4-story cold-formed steel light-framed structure over a concrete podium slab. Based on the AISI 400, the uplift force of the Holdown for the shear walls need to be amplified with a overstrength factor or expected shear strength factor. My question is do I need to design the podium slab with the amplified uplift force or not?
For example, the uplift force is 20k, the overstrength factor is 3, amplified uplift force 20x3 = 60k. Do I design the podium slab for 60k uplift force or 20k?
Thank you for help,
I am working on a project which has a 4-story cold-formed steel light-framed structure over a concrete podium slab. Based on the AISI 400, the uplift force of the Holdown for the shear walls need to be amplified with a overstrength factor or expected shear strength factor. My question is do I need to design the podium slab with the amplified uplift force or not?
For example, the uplift force is 20k, the overstrength factor is 3, amplified uplift force 20x3 = 60k. Do I design the podium slab for 60k uplift force or 20k?
Thank you for help,