I am looking at adding a mezzanine in an existing pre-engineered steel rigid frame building. I only have erection drawings of pre-engineered building and there is no way to contact the original pre-eng. office.
Can anybody clarify the followings:
1. Why is there a portal frame along the perimeter? what is the reason to have this?
If it is for resisting lateral loads, then how it is attached to main building. The drawings I have shows portal frame within the bay (about 1'2" away from main columns on either side)of lesser height than main building roof height.
2. Can I rest my mezzanine beam on one of the portal column (weak axis) or not. Is there any stability issue if I use portal frame column.
Can anybody clarify the followings:
1. Why is there a portal frame along the perimeter? what is the reason to have this?
If it is for resisting lateral loads, then how it is attached to main building. The drawings I have shows portal frame within the bay (about 1'2" away from main columns on either side)of lesser height than main building roof height.
2. Can I rest my mezzanine beam on one of the portal column (weak axis) or not. Is there any stability issue if I use portal frame column.