Have a look at the attached interface drawing.
Datum C in the machine definition will satisfy both location and orientation as defined in the customer interface drawing. Machine definition of Datum C (orientation and location) WRT datums A & B is defined by a position tolerance of .002. Customer interface defines the orientation and location of datum C WRT datums A & B as .014.
The axis of the 4 through holes in the machine definition will match the customer interface defined via the position of .014 WRT datums A and B. The customer interface defines the position of 5 mount holes as .014 WRT datums A and B.
The 4 vs 5 holes leads me to the question.
Do I need to modify the FCF on the machine definition to remove or modify for the impact of the datum shift allowance at datum C to ensure the interface will match the customer definition? Will this allow the 4 holes in the machine definition (Datum C shift) to move beyond what is allowed in the customer interface definition? Would I just change Datum C to be RFS vs M or would I include an additional single segment FCF modifier?
Datum C in the machine definition will satisfy both location and orientation as defined in the customer interface drawing. Machine definition of Datum C (orientation and location) WRT datums A & B is defined by a position tolerance of .002. Customer interface defines the orientation and location of datum C WRT datums A & B as .014.
The axis of the 4 through holes in the machine definition will match the customer interface defined via the position of .014 WRT datums A and B. The customer interface defines the position of 5 mount holes as .014 WRT datums A and B.
The 4 vs 5 holes leads me to the question.
Do I need to modify the FCF on the machine definition to remove or modify for the impact of the datum shift allowance at datum C to ensure the interface will match the customer definition? Will this allow the 4 holes in the machine definition (Datum C shift) to move beyond what is allowed in the customer interface definition? Would I just change Datum C to be RFS vs M or would I include an additional single segment FCF modifier?