struggle67
Structural
- Mar 29, 2013
- 116
Hi everyone I'm a fresh employee.I'm learning to become a post tension(PT) designer.Usually my company do two-way PT slab with drop panel and Banded slab(PT beam +PT slab).In Designing these slabs and beams what should be kept in mind?And In continuous slab and beam,how should I balance the load to determine the prestressed force.I don't know too much about PT.And I really appreciate you answers thank you all.