I am designing a Post-Tensioned Podium slab (concrete slab with 4-story wood construction ontop).
When designing a typical non-podium slab, i typically design the PT system to balance about 50 - 80% of the dead load of the slab's self weight. For a podium structure, how do you handle this with all of the "superimposed DL" i.e DL of the structure above?
Do most of you design for a higher percentage say 125% of balancing and check slab lift off and cracking at top surface? Or are people still only load balancing for the slab DL? I saw a thread that seems to suggest this, but i cant find much more information anywhere.
It doesnt seem correct to wait to stress until some of the building above has been installed. Shoring would need to remain in place longer.
Thoughts??
When designing a typical non-podium slab, i typically design the PT system to balance about 50 - 80% of the dead load of the slab's self weight. For a podium structure, how do you handle this with all of the "superimposed DL" i.e DL of the structure above?
Do most of you design for a higher percentage say 125% of balancing and check slab lift off and cracking at top surface? Or are people still only load balancing for the slab DL? I saw a thread that seems to suggest this, but i cant find much more information anywhere.
It doesnt seem correct to wait to stress until some of the building above has been installed. Shoring would need to remain in place longer.
Thoughts??